热心网友
时间:2022-05-02 17:26
团队建设及人员培训 The work-team building and the personnel training
1、 人员:原计划二期编167人,后调整为184人,目前已到位180人。
1. Personnel: the first plan is 167 people at the second scheled time but afterwards we change into 184 people, and now there are 180 people present.
2、 机构:除人事和财务、技术三个部门与一期共享外,二期建立了采购、生产、维修、仪电、化验、安全六个单独的部门。人员和机构基本能满足工厂运行的需要。
2. Department: besides HR department , finance department and technique department sharing with the first scheled time, we set up six separated departments, including stock, proction , maintenance, apparatus , assay and security. The personnel and the department have fulfilled the needs of the running of factory.
3、 安全:从8月18日合资公司开始进入工厂管理,工厂已安全运行132天。安全上主要做了以下工作:
—对所有入职的员工都进行安全知识的培训。安全管理体系已基本建立,从十月开始实施了月度安全例会制度,已召开月度安全会议三次。
—在项建设期进行了两项PHA和的次PSSR。
—建立并实施了事故的调查与跟踪体系。今年出现的两起工艺安全事故和一起急救事故都对行了跟踪调查
—建立了承包商的安全管理制度并实施了对承包商的安全管理。
3. Security: The company of joint venture has come into factory management since Aug8th and has run safely for 132 days. We have done the followings for our security:
----The employees have been trained on the security knowledge. We have set up the system of safety management , implemented the system of monthly safety regular meeting, and the monthly safety regular meetings have been held thrice.
----During the time of items building , we have carried through two set of PHA and PSSR.
4、 人员培训:人员培训从4月6日开始到8月17日结束,历时5个月,主要分三个阶段。
——4月6日—25日,基础的培训包括企业文化,工艺安全及生产基础知识的培训
——4月26日—6月4日:工艺操作培训。
——6月5日—7月15日:一期工作现场的培训
——化验人员在培训化验程序后分别两次到云梦工厂接受培训。
——管理人员根据工作需要开展了 “培训师的培训”(TTT)及商务礼仪、PM和SSC的培训。
——特殊岗位和工种参加*组织的培训,并取得相应的合格上岗证书,叉车工,压力容器。
4. The personnel training : started at Apr6th , ended at Aug17th and has lasted five months ,has three phases.
-----Apr6th to Apr25th, basal trainings, including corporation culture , technics safety and basal knowledge of the proction.
-----Apr26th to Jun4th , the training of the technics operation.
-----Jun5th to Jul15th, the training of fieldwork of the first scheled time.
-----After the training of assay process , the assayers have been sent to Yunmeng Factory for training.
-----According to the needs of work, the managers have been trained on TTT, the comity of business affairs , PM , SCC.
----- The special posts and work have been trained by the government, and acquired eligible certificates for mount guard, such as latheman and pressure vessel and so on.
5、 内部管理:
——行政人员的业绩管理已纳入XX的管理体系,非行政人员的管理在12月已全部推了绩效管理的试行方案。
——公司也执行了U8管理体系
——仪电部门已建立工具管理清单和管理制度,仓库管理已完成备件清理,正月在做规范化的工作。
5. The inner management:
------The performance management of administrators has been brought into XX management systems, and the performance of the other employees will be tried out in December.
------The company has implemented U8 management system.
------The apparatus department has set up the list of instruments management and management system. The storage management has finished clearing of the spate part and now is doing the standard jobs.
热心网友
时间:2022-05-02 18:44
Team-building and training of personnel
1, Phase 2 Addenm : The original staff of 167, after adjustments for the 184, At present, 180 people have been put in place.
2 : In addition to personnel and financial institutions, the three departments with a view to sharing technology, the establishment of the second phase of the procurement, proction, maintenance, Instrument, testing, six separate security departments. Personnel and agencies to meet the basic needs of the factory operation.
3, security : from August 18 joint venture companies started to enter the factory management, the plant has safely operated for 132 days. Security work on the following : the main-entry to all the staff for safety training. Security management system has been basically established, implemented from October regular monthly security, the Security Council has met three times monthly. - Building projects in two phases and the time PHA PSSR. - Establish and implement a tracking system and the investigation into the incident. This year the two together process safety incidents and accidents have concted a follow-up survey on emergency-establish a safety management system and implemented a contractor of the contractor's safety management.
4, personnel training : the training of personnel from April 6 until the end of August 17, lasted five months, mainly divided into three phases. -4 6 -25, - based training, including corporate culture, basic knowledge of the proction process and safety training-4 26 6 4 : operation of the training process. 5 -7 -6 15 : The one-year work-site training -- training in testing proceres were tested twice to Cloud DreamWorks training. -- Management needs to be done in accordance with the "trainer training" (TTT) and business etiquette. PM and SSC training. -- Participate in the special positions and jobs training, and obtained corresponding appointment of qualified certificates for forklifts, pressure vessel.
5 : internal management -- Performance management has been included in the administrative staff of the XX management system December non-executives in the management of performance management has been pushing a pilot program. U8 implementation of a management system -- also have established -- -- NG inventory management tools and management systems. Spare Parts Warehouse Management liquidation has been completed, the standardization work done on the fourth day.
热心网友
时间:2022-05-02 20:18
1. Personnel: the first plan is 167 people at the second scheled time but afterwards we change into 184 people, and now there are 180 people present.
2、 机构:除人事和财务、技术三个部门与一期共享外,二期建立了采购、生产、维修、仪电、化验、安全六个单独的部门。人员和机构基本能满足工厂运行的需要。
2. Department: besides HR department , finance department and technique department sharing with the first scheled time, we set up six separated departments, including stock, proction , maintenance, apparatus , assay and security. The personnel and the department have fulfilled the needs of the running of factory.
3、 安全:从8月18日合资公司开始进入工厂管理,工厂已安全运行132天。安全上主要做了以下工作:
—对所有入职的员工都进行安全知识的培训。安全管理体系已基本建立,从十月开始实施了月度安全例会制度,已召开月度安全会议三次。
—在项建设期进行了两项PHA和的次PSSR。
—建立并实施了事故的调查与跟踪体系。今年出现的两起工艺安全事故和一起急救事故都对行了跟踪调查
—建立了承包商的安全管理制度并实施了对承包商的安全管理。
3. Security: The company of joint venture has come into factory management since Aug8th and has run safely for 132 days. We have done the followings for our security:
----The employees have been trained on the security knowledge. We have set up the system of safety management , implemented the system of monthly safety regular meeting, and the monthly safety regular meetings have been held thrice.
----During the time of items building , we have carried through two set of PHA and PSSR.
4、 人员培训:人员培训从4月6日开始到8月17日结束,历时5个月,主要分三个阶段。
——4月6日—25日,基础的培训包括企业文化,工艺安全及生产基础知识的培训
——4月26日—6月4日:工艺操作培训。
——6月5日—7月15日:一期工作现场的培训
——化验人员在培训化验程序后分别两次到云梦工厂接受培训。
——管理人员根据工作需要开展了 “培训师的培训”(TTT)及商务礼仪、PM和SSC的培训。
——特殊岗位和工种参加*组织的培训,并取得相应的合格上岗证书,叉车工,压力容器。
热心网友
时间:2022-05-02 22:10
rrgrgs
热心网友
时间:2022-05-03 00:18
现在的人啊
帮忙翻译些句子(汉翻英,不要用机器翻哦!!)高分悬赏哦!!
I am go to school for lessons every monday to friday.每周一至周五我都要去学校上课。I do reading novels when I finish my homeworks after class.放学后,我会在完成作业后,看些小说。Pop music and thriller are my favorite.我喜欢流行音乐,看恐怖小说。Music helps to relax me and re...
求汉译英,请不要使用机器翻译,好的定给高分
Sandfield mounted social this big stage to Jane Eyre to arrive after officially Sandfield.Sandfield to Jane Eyre is a completely strange place.She arrives this official mansion to be a tutor, she knew this is one is at any position and the status work.He gingerly, adopts is the ...
汉译英,很急!4点前,不要机器翻译。加分
1 when watching TV,the students spot that the man stood behind the journalist was the headmaster .2 the evidence showed that he was not on the spot when the accident happened 3 the terrorist claimed that they had set the journalist free.4 in order to give his wife a ...
汉翻英,拒绝机译,好的加分
we set up six separated departments, including stock, production , maintenance, apparatus , assay and security. The personnel and the department have fulfilled the needs of the running of factory.3
...一下这些句子,英译汉和汉译英。如果答案满意,加分。不要机械翻译_百...
He cannot serve pass the net.2.有没有人接待你 Do you have anyone meeting you?3.那箱子供我们当桌子用 That box is used as a table by us.4我有点累,你来替我驾驶好吗?I'm a little tired, can you drive in my place?5.我叫比尔时,他一下转过身 When I called for Bill,...
汉译英,拒绝机器翻译,谢谢
They are young, mostly 70 to 80 years born, they speak in every computer technology, the practice of using OICQ or MAIL in a virtual world with people and information through the Internet to know their fathers than the much more; showing confidence in their tender faces its own ...
大神们,翻译一下论文,汉译英,不要机器翻译的,万分感谢! 吸水量是以...
译文:Water is 14% of the amount of water as a benchmark, per 300 g flour in opaque instrument amalgamated into a maximum consistency of 500 bu the amount of water needed to the dough. Can be seen from table 1, along with the inulin, with the increase of adding amount of ...
汉译英,谢绝机翻。O(∩_∩)O谢谢
account of his company with my own 123 Chinese yuan in my Shenzhen development bank account,and later to remit the dollars into my wife Mrs.Lisi's Standard Chartered Bank Account.All of we three--Zhangsan,Lisi and I --agree to this deal.【公益慈善翻译团】真诚为您解答!
高分求帮忙翻译一段话,(汉译英,拒绝机器翻译)
★★★ 不翻译也就罢了,翻译的话还是尽量自己做,努力做好!瞎起哄捞分一点意思都没!机器翻译更是无聊之举!★★★ 企业简介 Company profile 山东聊城宏大电缆厂,位于聊城市嘉明工业园,Shandong LiaoCheng City Hongda Cable Factory is located in the LiaoCheng Jiaming Industrial Park,西临京九...
汉译英 拒绝机翻
saw an old man lying in the middle of the road.His mother suffered from heart attack last year.What makes him surprised is that he has passed the Maths exam.Yesterday Mary promised to help me to learn English.Due to her help, I got good result in the speech competition....