请求帮助翻译一下此文章,译成英文,急需!!!谢谢了!
发布网友
发布时间:2022-05-30 10:55
我来回答
共2个回答
热心网友
时间:2023-10-17 03:35
Operational tasks 110 KV # contact change, line, line, group by group bus inverted bus operation, group bus blackout
Operation of the project
1 in the scheling order to check the mother of 110 KV switch and bus group does not work, and live with the conditions (of votes have all been recovered, safety measures have all been removed, all badges have been recovered).
2 of the five-check of simulated dress rehearsal.
3 Inspection Unit 110 KV bus grounding switch has indeed started.
4 inspection of 110 KV mother switch group Ⅰ bus side grounding switch has indeed started.
5 inspection of 110 KV mother switch group Ⅱ bus side grounding switch has indeed started.
110 KV Group 6 check on the bus were all switch off position.
7 to 110 KV mother on the operation of the power switch insurance, and push its signal power on the switch. 8 inspection 110 KV bus protection on-screen dancing is the mother of the clips have been put into switch.
9 invest 110 KV bus protection screen on the "bad mother charging protection clips" clips.
10 on a group bus PT 110 KV power supply switch "switch power supply" air switch. 11 onto 110 KV bus group PT switch.
12 of 110 KV group on the bus PT secondary voltage "to protect voltage" air switch (including the phase A, B phase, C phase).
13 of 110 KV group on the bus PT secondary instrument voltage "Instrument voltage" air switch (including the phase A, B phase, C phase).
14 of 110 KV group on the bus PT secondary voltage "Over the same period voltage" air switch.
15 of 110 KV mother on the power switch between the power switch "switch power supply" air switch. 16 inspection of 110 KV mother is in the disconnect switch position.
17 of the 110 KV mother of the switch group bus side switch.
18 of the 110 KV mother of the switch group bus side switch.
19 in 110 KV mother of the switch over the same period TK switch.
20 would-twisting over the same period ISTK switch to "fine tune" position.
21 will be closed over the same period STK switch-twisting to "lift" position.
22 of 110 KV mother on the bus switch on the group charged.
23 off 110 KV mother of the switch over the same period TK switch.
24-disconnect switches ISTK the same period.
25 disconnect switches STK the same period closed.
26 check Busbar 110 KV charging the normal group, the parent of the 110 KV remove the operation of the power switch insurance. 27 from 110 KV bus protection screen on the "bad mother charging protection clips" clips.
28 in 110 KV bus protection "bus voltage Internet" clips.
29 of the 110 KV # switch variable contact group bus side switch.
30 of the 110 KV line switch group bus side switch. 31 of the 110 KV line switch group bus side switch. 32 inspection groups 110 KV line switch bus side is indeed a switch on.
33 opened 110 KV line switch group bus side switch.
34 inspection groups 110 KV line switch bus side is indeed a switch on. 35 opened 110 KV line switch group bus side switch.
36 inspection 110 KV # switch variable contact group bus side switch has indeed closed. 37 opened 110 KV # switch variable contact group bus side switch. 38 inspection groups on the bus all the components have been switching finished, with the exception of PT switch, the rest are all in the disconnect switch position.
39 from 110 KV bus protection "bus voltage Internet" clips.
40 to 110 KV mother on the operation of the power switch insurance.
41 will switch all of the 110 KV power meter by PT secondary voltage switch to (run) on the bus PT.
42 inspection of 110 KV mother is no current three-phase switch.
43 off 110 KV mother of the switch.
44 inspection of 110 KV mother is in the disconnect switch position.
110 KV mother started 45 of the switch group bus side switch.
110 KV mother started 46 of the switch group bus side switch.
47 off 110 KV mother of switching between the power supply switch "switch power supply" air switch. 48 off 110 KV bus group PT secondary instrument voltage "Instrument voltage" air switch (including the phase A, B phase, C phase).
49 off 110 KV group PT secondary voltage bus "to protect voltage" air switch (including the phase A, B phase, C phase).
50 off 110 KV bus group PT secondary voltage "Over the same period voltage" air switch.
51 Group opened 110 KV bus PT switch.
52 off 110 KV bus group PT switch power supply, "Dynamic Power Switch" air switch. 53 Remove the 110 KV switching operation of the home insurance and opened signal power switch.
54 are finished, report scheling.
Operation: Guardian: squad leader: the value of:
热心网友
时间:2023-10-17 03:35
这么长的文章你还是多给点分吧,或许有人愿意干.