Operational tasks 110 KV # contact change, line, line, group by group bus inverted bus operation, group bus blackout
Operation of the project
1 in the scheling order to check the mother of 110 KV switch and bus group does not work, and live with the conditions (of votes have all been recovered, safety measures have all been removed, all badges have been recovered).
2 of the five-check of simulated dress rehearsal.
3 Inspection Unit 110 KV bus grounding switch has indeed started.
4 inspection of 110 KV mother switch group Ⅰ bus side grounding switch has indeed started.
5 inspection of 110 KV mother switch group Ⅱ bus side grounding switch has indeed started.
110 KV Group 6 check on the bus were all switch off position.
7 to 110 KV mother on the operation of the power switch insurance, and push its signal power on the switch. 8 inspection 110 KV bus protection on-screen dancing is the mother of the clips have been put into switch.
9 invest 110 KV bus protection screen on the "bad mother charging protection clips" clips.
10 on a group bus PT 110 KV power supply switch "switch power supply" air switch. 11 onto 110 KV bus group PT switch.
12 of 110 KV group on the bus PT secondary voltage "to protect voltage" air switch (including the phase A, B phase, C phase).
13 of 110 KV group on the bus PT secondary instrument voltage "Instrument voltage" air switch (including the phase A, B phase, C phase).
14 of 110 KV group on the bus PT secondary voltage "Over the same period voltage" air switch.
15 of 110 KV mother on the power switch between the power switch "switch power supply" air switch. 16 inspection of 110 KV mother is in the disconnect switch position.
17 of the 110 KV mother of the switch group bus side switch.
18 of the 110 KV mother of the switch group bus side switch.
19 in 110 KV mother of the switch over the same period TK switch.
20 would-twisting over the same period ISTK switch to "fine tune" position.
21 will be closed over the same period STK switch-twisting to "lift" position.
22 of 110 KV mother on the bus switch on the group charged.
23 off 110 KV mother of the switch over the same period TK switch.
24-disconnect switches ISTK the same period.
25 disconnect switches STK the same period closed.
26 check Busbar 110 KV charging the normal group, the parent of the 110 KV remove the operation of the power switch insurance. 27 from 110 KV bus protection screen on the "bad mother charging protection clips" clips.
28 in 110 KV bus protection "bus voltage Internet" clips.
29 of the 110 KV # switch variable contact group bus side switch.
30 of the 110 KV line switch group bus side switch. 31 of the 110 KV line switch group bus side switch. 32 inspection groups 110 KV line switch bus side is indeed a switch on.
33 opened 110 KV line switch group bus side switch.
34 inspection groups 110 KV line switch bus side is indeed a switch on. 35 opened 110 KV line switch group bus side switch.
36 inspection 110 KV # switch variable contact group bus side switch has indeed closed. 37 opened 110 KV # switch variable contact group bus side switch. 38 inspection groups on the bus all the components have been switching finished, with the exception of PT switch, the rest are all in the disconnect switch position.
39 from 110 KV bus protection "bus voltage Internet" clips.
40 to 110 KV mother on the operation of the power switch insurance.
41 will switch all of the 110 KV power meter by PT secondary voltage switch to (run) on the bus PT.
42 inspection of 110 KV mother is no current three-phase switch.
43 off 110 KV mother of the switch.
44 inspection of 110 KV mother is in the disconnect switch position.
110 KV mother started 45 of the switch group bus side switch.
110 KV mother started 46 of the switch group bus side switch.
47 off 110 KV mother of switching between the power supply switch "switch power supply" air switch. 48 off 110 KV bus group PT secondary instrument voltage "Instrument voltage" air switch (including the phase A, B phase, C phase).
49 off 110 KV group PT secondary voltage bus "to protect voltage" air switch (including the phase A, B phase, C phase).
50 off 110 KV bus group PT secondary voltage "Over the same period voltage" air switch.
51 Group opened 110 KV bus PT switch.
52 off 110 KV bus group PT switch power supply, "Dynamic Power Switch" air switch. 53 Remove the 110 KV switching operation of the home insurance and opened signal power switch.
54 are finished, report scheling.
Operation: Guardian: squad leader: the value of:

热心网友 时间:2023-10-17 03:35

这么长的文章你还是多给点分吧,或许有人愿意干.
声明声明:本网页内容为用户发布,旨在传播知识,不代表本网认同其观点,若有侵权等问题请及时与本网联系,我们将在第一时间删除处理。E-MAIL:11247931@qq.com
如果银行拒贷有哪些办法 小天鹅滚筒洗衣机水位多少合适 阴阳师百闻牌攻略大全 百闻牌式神卡组阵容大全 阴阳师百闻牌三大妖狐阵容推荐 妖狐流派怎么搭配?-新手攻略-安族网... 阴阳师百闻牌妖狐快攻阵容 怎么搭配攻略推荐 阴阳师百闻牌妖狐技能攻略 妖狐属性及卡组搭配推荐-新手攻略-安族网... 阴阳师百闻牌妖狐最强卡组 阵容怎么搭配攻略 阴阳师百闻牌妖狐卡组推荐 怎么搭配攻略分享 带鹏字的公司名字大全 鹏字开头公司起名 叶罗丽娃娃玩具店在哪 哪位大仙可以帮我现写一篇“节约能源,从我做起”的英语作文 购物网网站大全,谁能介绍个啊? 要好的哦,买东西要正品好用的! 全世界都停电歌词的英文 colors describe a situation 布兰妮在过去的【沉沦时期】的她都有什么丑闻啊? 映泰的G.P.U(Green Power Utility)不能使用 blackout periods和preclearance of securities transactions在经济角度怎么翻 什么是blackout period 有谁给推荐一本适合高三基础差的学生用的复习资料,内容上侧重于基础知识讲解,内容详细。 请问高三应该买哪些复习资料?(对于基础差点的)帮忙推荐几本好书。 晚上睡觉打鼾 打鼾 男,40岁,打鼾至鼾醒,睡觉靠张口呼吸,该如何治疗 睡觉打鼾容易醒吗 阴阳师用红色达摩作为升星的狗娘好不好?我知道白色和黑色都比较珍贵,具体怎么用这三种比较好? 哈弗h3有几个温度传感器,都在哪? 长城h2进气温度传感器在哪 苹果6S为什么电话来时有声音.按了一下声音调节件就成静音了。是电话有问题吗? 阴阳师前期升星用达摩好吗? 海尔电视t82哪儿好 阴阳师升六星材料给哪只好 宿舍好多蟑螂,如何消灭? 求2010年上海高考英语阅读理解答案啊! 求助那位仁兄帮我翻译下面的文献 求一篇 英语演讲稿 17年德龙X3000有OBD吗 2017年咦1月出的陕汽德龙X3000是国几的? 策划部面试考题 德龙X3000点火开关一打没反应,钥匙一松就着火 陕汽德龙x3000报价国五 豪沃tx和德龙X3000对比 德龙X3000国四发动机故障,车辆网络故障,求大神指点迷津。 喜马拉雅中谁的声音最好听的 2014年五菱宏光现在能买多少钱 14年五菱宏光1.4发动机多钱 14年五菱荣光小卡事国几的车? “猩猩哥”用韩语怎么说和写? 为什么那么多人喜欢阴阳怪气男团 《非诚勿扰》中成都饲养员“猩猩哥”是在哪一期?他养的红毛猩猩是乐申吗? 猩猩哥对象是谁 本人寻找一部以前凤凰卫视中文台播过的一部日剧? 内容大致是,有人在日本研究不知道什么东西来着,反正是要毁灭地球了,然后主人公和一只小黑猩猩 拯救来着