Three Gorges underground power plant tailwater damping well concrete construction technology the Three Gorges underground power plant tailwater damping well slightly has the construction environment, the safe hidden danger to be big, the construction time is tight, overflow surface quality requirement higher characteristic. After the research, determined that uses forms the corbel well circle structure first in the damping well base concrete, then uses the hydraulic pressure slip form in the well circle to construct the formation continuously the plan. After the lining work concrete construction finished, the damping well wall was smooth, the formation quality was high, was under overseeing and the owner unit's approval.

热心网友 时间:2023-08-17 11:49

Three Gorges underground power station damping tail water wells concrete construction technology end of the Three Gorges underground power station with the construction of water wells damper on the environment, security risks, tight construction period, the flow of high quality requirements. The study identified a damping wells in the first poured concrete form at the bottom bracket Jingquan structure, then the use of hydraulic sliding Jingquan for forming and pouring the programme. Lining concrete construction has been completed, damping Well smooth wall, forming high-quality, and by the Commissioner of the owners of the units authorized.

热心网友 时间:2023-08-17 11:49

The Three Gorges underground power plant tailwater damping well slightly has the construction environment, the peaceful entire hidden danger to be big, the construction time is tight, overflow surface quality requirement higher characteristic. After the research, determined that uses forms the corbel well circle structure first in the damping well base concrete, then uses the hydraulic pressure slip form in the well circle to construct the formation continuously the plan. After the lining work concrete construction finished, the damping well wall was smooth, the formation quality was high, was under overseeing and the owner unit's approval.

热心网友 时间:2023-08-17 11:50

The end of the Three Gorges underground power station with the construction of water wells damper on the environment, security risks, tight construction period, the flow of high quality requirements. The study identified a damping wells in the first poured concrete form at the bottom bracket Jingquan structure, then the use of hydraulic sliding Jingquan for forming and pouring the programme. Lining concrete construction has been completed, damping Well smooth wall, forming high-quality, and by the Commissioner of the unit owners approved

热心网友 时间:2023-08-17 11:50

Three Gorges underground power station damping tail water wells concrete construction technology

The end of the Three Gorges underground power station with the construction of water wells damper on the environment, security risks, tight construction period, the flow of high quality requirements. The study identified a damping wells in the first poured concrete form at the bottom bracket Jingquan structure, then the use of hydraulic sliding Jingquan for forming and pouring the programme. Lining concrete construction has been completed, damping Well smooth wall, forming high-quality, and by the Commissioner of the owners of the units authorized.

热心网友 时间:2023-08-17 11:51

The tailrace damping well of The Three Gorges Underground Power Station has many characteristics such as small environmental construction, big hidden danger,limit construction period, high quality requirements of the cross section. After studying, we decide to use a scheme that pour a bracket well ring which is made by concrete at the bottom of the tailrace damping well first, and then use a hydraulic slipform to form it by continuous pouring on the ring. When the lining concrete construction is finished, the smooth shaft lining of the tailrace damping well and high quality of the forming obtained the accreditation from the overseeing and owner ' s company
自己做的,仅供参考。
声明声明:本网页内容为用户发布,旨在传播知识,不代表本网认同其观点,若有侵权等问题请及时与本网联系,我们将在第一时间删除处理。E-MAIL:11247931@qq.com
Linux系统安装FTP服务器 Linux系统的网络文件共享 建筑的七盏明灯的内容简介 面向对象设计七大原则 简单说 交互设计七大定律 交互设计的“根”——七大定律 交互设计原则和理论2——七大定律 七大设计原则 附近的加油站有哪些 附近的加油站有哪些地方 专业英语翻译,在线等。 土木工程专业的翻译 请教土木工程专业英语翻译 汉译英: 游戏本推荐哪个比较靠谱?全新Alienware m15 2020版性能如何? 有使用效果比较好的游戏本推荐吗?戴尔Alienware m15值得购买吗? 兄弟们, 戴尔alienware m15好吗?给个中肯的建议呗! 戴尔全新Alienware m15性能如何?选择游戏本可以入手这款吗? 外星人m15 R17和戴尔g15怎么选 魅族手机右上角出现这个图标是干什么的 哪有嵌入式Linux的学习资料,入门级别的,网上那些都是很泛泛的,最好是以ubuntu10.04为宿主系统的? 税金及附加科目余额在期末应直接转入本年利润的贷方对吗? 相机对焦是什么意思 放射科里做DR胸片时有块像鼠标垫一样的东西,请问这是什么? 信用卡以卡办卡怎么办理信用卡呢 DR摄片条件 哪些银行信用卡可以在网上直接申请,可以以卡办卡 我想知道DR和胸片是一样的吗?哪个辐射更大些。 请问信用卡怎么网上申请以卡办卡?谢谢啦 关于珍惜水的名人名言 绵阳盐亭30000亩油菜花悄然绽放,你的地区到了初春有着怎样的美景? 求助翻译: 帮忙翻译,汉译英,超高悬赏100! 四川赏花踏青去哪儿好?旅游攻略该怎么做? 有没有专业人士 帮我翻译下一这段文字 翻译成英文 求高人翻译一段话,汉译英,不要机器翻译的,大学用的,急着用谢谢了!!!有好的再追加分、 SQL union语句问题 SQL UNION 的用法中前后两个查询语句所含字段是否一定要相同? 西安环城南路y酒店到大唐不夜城有多少公里? 做梦在地里面种黄豆好不好? 天津事业退休人员医保卡注资有28元和35元之分 关于天津市医保卡的注资 天津医保注资金额为什么有的28元,有的发35元? 天津医保账户2021年2月份怎么没有注资了? QQ超市怎么样可以把柜台退货 天津市换社保卡后医疗保险个人帐户注资是打的晚吗? qq超市摆法后的货架如何取消 天津社保注资金额是什么 QQ超市怎么退货 天津社保卡不往银行账户注资是什么回事?